PROJECT DETAILS
Works included refurbishment works to the Interior & Exterior of the existing School Building, the building houses the trades facilities downstairs for the students to learn including a woodwork, Automotive, textile rooms along with the upstairs classrooms on the second floor.
DCON Painting had the joy of bringing the ground floor back from its existing vinyl tiles floor to an epoxy finish, which included the removal of all the old glue from the concrete floor with diamond grinding and the rectification works to concrete floor which included filling any holes or self-leveller to get the floor to a modern standard before applying the epoxy coatings.
CLIENT
Ballarat High School
SECTOR
Education/Refurb
SUB SECTOR
High School
PROJECT VALUE
$2-3 Million